Operating the new elevator of the lower parking lot in front of the Hecht Arts Centre

Operating the new elevator of the lower parking lot in front of the Hecht Arts Centre

By: Engineering, Infrastructure and Security Division
Published in:
SDGs : SDG 11  |  Units: Administration  | Time: 2023 |  Link
Description: On Sunday 05.03.2023 were opened for public use the elevator and stairwell of the new parking lot that was built together with the cable car in front of the Arts Center. The new facilities are part of the university’s accessibility vision and will also reduce transit times between the buildings on the Mountain campus.